Fast Fusion

IMG_0134

Check out our Fast Fusion machine!  This machine will fuse 4″ – 20″ HDPE pipe.  First, the machine shaves off the ends of the pipes to be fused, and then a heat plate set to the proper temperature heats the ends of the pipe for a set amount of time.  The heat plate is removed, and the Fast Fusion machine’s hydraulic clamps pull the pipes together and holds them tight during the cool down period.  Once the desired, cooler temperature is reached, the Fast Fusion machine will advance along the pipeline to the next joint, saving time and resources!

Cutting Pipe Ends

Removing Heat Plate

Check out the Fast Fusion Machine advancing: